BCCL WASHERIES

 

 

 

 

Introduction :

 

 

 

Coal Washing   is a process of separation  mainly based on difference in Specific Gravity of Coal and associated impurities like Shale, Sand & Stones etc so that we get relatively pure marketable coal without changing its  physical properties.

 

             The Washed Coking Coal is meant for Steel Plants. The Washed Power Coal/Washed Non-Coking Coal/Middlings is dispatched to various Power Houses.

 

Washing Process:

 

 

 

 

 

 

 

Washery

System of Washing

 

Dugda-II

HM Cyclone (13-0.5mm), Flotation (-0.5mm)

 

Bhojudih

Deshaling Jig (75-0mm), HM Bath (75-25mm),

 

 

Batac Jig (25-0.5mm), Flotation (-0.5mm)

 

Patherdih

Deshaling Jig(75-0mm), HM Bath(75-13mm),

 

 

HM Cyclone (13-0.5mm)

 

 

Sudamdih

2 Stage HM Cyclone (37-0.5mm), Flotation (-0.5mm)

 

Moonidih

2 Stage HM Cyclone (30-0.5mm),W/O Cyclone(-0.5mm)

 

Mohuda

HM Cyclone (25-0.5mm), Flotation (-0.5mm)

 

Madhuban

Batac Jig (13-0.5mm), Flotation(-0.5mm)

 

Details of Existing Washeries :

 

 

 

 

 

S. No.

Name of Washery

Year of Commissioning

Operable Capacity

MTY

A. Coking Coal:

1

Dugda-II

1968

2.00

2

Bhojudih

1962

1.70

3

Patherdih

1964

1.60

5

Moonidih

1983

1.60

4

Sudamdih

1981

1.60

6

Mohuda

1990

0.63

7

Madhuban

1998

2.50

TOTAL (Coking Coal)

 

11.63

 

 

 

 

B. Non-Coking Coal:

 

 

1

Dugda - I

1961/1998

1.00

TOTAL (Non-Coking Coal)

 

1.00

GRAND TOTAL

 

12.63

 

 

Remarks:

 

 

 

Dugda-I stoped since Oct.'96 for safety reasons and its Sink Upgradation Section is being used for production of washed power coal w.e.f. '98.

 

Madhuban Washery was originally designed for washing Coking Coal.Due to non-availability of Coking Coal because of stoppage of Block-II OCP, the Washery was temporarily converted for Washing  Non-Coking Coal which has been reverted back to washing coking coal again from October 2008.

 

 

 

 

Modernization of Washeries:

 

Revival Plan of BCCL provides Rs. 125 Crores for Renovation of Washeries.

Study was undertaken by CMPDI for performance improvement.

In the 1st Phase, the Revival Schemes involving an expenditure of Rs. 54.80 Crores has been approved by BCCL Board for Dugda-I, Dugda-II, Bhojudih, Sudamdih, Moonidih & Mohuda Washeries and they are under various stages of implementation.

                    

                   PERFORMANCE OF BCCL WASHERIES

 

PERFORMANCE:

 

 

 

 

 

 

(Fig in ‘ 000 T)

Year

R/C Feed

W/C Prodn.

W/C Desp.

Coking:

 

 

 

2006-07

3129.1

1660.4

1665.8

2007-08

3177.2

1661.5

1679.8

2008-09

3313.8

1604.5

1588.6

 

Non-Coking

 

 

 

2006-07

4349.1

2717.3

1072.2

2007-08

890.9

788.4

822.4

2008-09

794.4

868.5

876.7

 

  CONSUMERWISE DESPATCH:

 

a) Washed Coal :

 

(Fig in ' 000 T)

Steel Plant

2006-07

2007-08

2008-09

B S L

559.7

670.7

441.5

B S P

353.2

353.4

451.7

D S P

222.5

313.2

231.2

R S P

291.7

304.7

261.5

IISCO

238.8

18.9

23.2

DPL

-

-

15.2

RINL

-

18.8

164.2

Total

1665.8

1679.7

1588.6

 

b) W/Power Coal  :

 

(Fig in ‘ 000 T)

Power Plant

2006-07

2007-08

2008-09

BSL

209.3

7.0

11.7

BSP

-

-

8.2

BPSCL

-

84.2

131.3

DSP

21.0

3.8

88.5

RSP

-

3.6

14.3

DCOP

838.4

-

-

KTPP

-

3.6

-

Panipath

-

720.1

618.9

Ropar

3.6

0.0

3.7

Total

1072.3

822.5

876.7

 

 

c) Middlings :

 

 

(Fig in ' 000 T)

Power Plant

2006-07

2007-08

2008-09

Bhatinda

-

-

-

BPSCL

-

93.3

28.7

BSL

288.3

24.9

16.1

BSP

-

-

3.0

DSP

260.1

174.3

164.2

IISCO

0.7

-

-

KTPP

7.2

32.3

156.6

MTPS

346.5

553.2

416.6

NALCO

-

14.3

-

Panipath

3.8

-

-

RSP

-

3.8

17.6

STPS

120.8

139.4

104.7

Total

1027.3

1035.5

907.5

 

DESPATCH OF SLURRY & REJECTS:

(Fig in ' 000 T)

By-Product

2006-07

2007-08

2008-09

Slurry

120.6

62.7

420.1

Reject

183.8

85.7

80.6

Total

304.4

148.4

500.6

 

Performance Highlights of the Year 2008-09

 

         The company has concluded the year 2008-09 with excellent performance,

  as mentioned hereunder:-

 

n                 Production of Washed Power Coal increased from 7.9 LT in FY 2007-08 to 8.7 LT

           in the FY  2008-09 i.e. a growth of about 10%.

n                Dispatches of Washed Power Coal also registered a growth of about 7% over Washed Power Coal dispatches during the year 2006-07.

n                Increase in Stock Liquidation during 2008-09 as compared to 2007-08. The Stock liquidation   during 2008-09 valued Rs. 40.01 Crores as compared to Rs. 5.94 Crores during 2007-08.

n               BCCL Washeries (other than Madhuband) have recorded an increase in profit of 55.6%   during   2008-09 as compared to 2007-08.

n                Increase in the dispatch/sale of Slurry during 2008-09 as compared to 2007-08.

n                All Washeries continue to maintain Closed Water Circuit and “Zero Discharge” is ensured.

n                Employees' welfare, safety, training and community development continued to be the other focus areas.

 

           PROFIT/LOSS STATEMENT OF BCCL WASHERIES

 

Amt. in Rs. Lakhs

Washery

2006-07

2007-08

2008-09

Dugda-I

633.2

2.7

-97.9

Dugda-II

2664.5

2066.8

6129.8

Bhojudih

2235.5

2429.1

7966.0

Patherdih

-813.3

-1438.0

-3712.7*

Sudamdih

1436.3

410.0

66.0

Moonidih

3713.4

3596.4

328.3

Mohuda

896.0

-140.4

96.9

Total

10765.6

6926.6

10776.4

 

 *  The loss of Patherdih includes Rs. 24.0 Crores

provision for stock deterioration.

 

                         PROPOSED WASHERIES AT BCCL

 

Name of the Washery

Capacity (Mtpa)

NLW:

 

Madhuban

5.0

Patherdih

2.5

Dugda

2.5

Sub-Total

10.0

 

 

Non Coking:

 

Patherdih

5.0

Bhojudih

2.0

Dahibari

1.6

Sub-Total

8.6

 

 

G.Total

18.6

 

                 ENVIRONMENTAL AWARENESS

  

         Major Pollution Control Measures taken in BCCL Washeries:

 

n       Effluent treatment / Re-circulation arrangement

n       Water Sprinkling in a radius of nearly 2 km of the Washery

n       Tree Plantation   around Washery premises and colonies done every year.  

n       Rain Water Harvesting

 

           Other key activities for effective pollution control:

     n       Systematic and scientific excavation of the slurry ponds to make the space available for settling of                 fines in the ponds / dyke area itself and recycle back the clear water through pumps for re-use in                 the plant as process water.

n       The recycling pumps have been fully renovated and are operating under strict supervision to avoid any out flow of even clear water.

n        Market has been found for sale of old stock of slurry of the Washery.

Disposal of Washery By-products during the period 06-07 to 08-09 has been as follows:-

By-Product

2006-07

(‘000T)

2007-08

(‘000T)

2008-09 (‘000T)

Middlings

1027.3

1035.5

907.5

Slurry

120.6

62.7

420.1

Reject

183.8

85.7

80.6

 

 

      Future Plans:

     n       Capital replacements wherever required in the existing system of pollution control measure will be                 carried out.

n       Fine coal circuit will be modernized with automation and instrument control system.

n       General awareness for eco-friendly environment among all concerned.

  

  WELFARE MEASURES

              Social Welfare programmes organised at various hospitals / Dispensaries

              during 2008-09 are as follows:

 

Name of Unit

Camp Organised

Date

Washery Division Dispensary

i.

Hypertension Camp

-

4.12.08

 

ii.

Village Health Checkup camp

-

22.12.08

 

iii.

Health awareness camp

-

9.01.09

 

iv.

Aids awareness camp

-

19.01.09

 

v.

Mobile van-village health checkup done in different villages.

-

4.02.09 to 06.02.09

 

Dugda Coal Washery

i.

Baby Show

-

12.02.09

 

ii.

School Health Checkup Programme

-

26.02.09

 

iii.

Health Awareness Camp

-

28.02.09

 

iv.

Wellness Clinic (CSR) at Hospital

-

Daily

 

v.

Mobile van-village health checkup done in different villages & medicine distributed

-

17.02.09 to 21.02.09

 

Bhojudih Coal Washery

i.

Health Awareness Camp

-

14.12.08 to 09.01.09

 

ii.

Aids awareness programme

-

27.01.09

 

iii.

BP checkup Camp

-

12.02.09

 

Patherdih Coal Washery

i.

BP checkup Camp

-

10.01.09

 

ii.

Diabetes detection Camp

-

15.11.08

 

iii.

Mobile van-village health checkup done in different villages.

-

30.12.08 to 31.12.08